Project: Bonair Campus Planning and Rennovation, Stanford University
The historical maintenance buildings needed attention. As the caretakers of a legacy, the buildings that house the maintenance groups are the last to be updated. CNA worked with Stanford to devise a plan to update, refresh and create a safe environment for the staff who work so very hard to care for others.
The scope includes multiple building renovations with particular considerations for energy and system upgrades. The workplace strategy was carefully considered and rolled out into all five buildings.
With a significant focus on energy and carbon reduction, the project location and program strategy devised to achieve 26 metric tones of co2 emission reduction each year from elimination of SOV trips. In collaboration with the International Living Future Institute, all new materials were of the highest environmental quality with the ‘Declare’ label certification of a responsible material.
Project Bonair Campus Planning and Renovation Location Stanford, California Size 140,500 sq ft Program Hybrid Workplace,Client Stanford University Project Manager Department of Project Management, LBRE Architect Chester Nielsen Architects, Inc. General Contractor Milroy Construction , Inc. Project Delivery 2019